Today was our first work day of the 2007 trip. It's usually a day set for preparation and organization - a semi relaxed day, but not this year. There was a lot to do and little time. Teams A-1 and B set out to work miscellaneous projects on one of the bateys and Team A worked on cementing the walls of the new elevator shaft. Once we realized how much work was involved at the Hospital, we needed to bring back Teams A-1 and B. We were hoisting up bags of cement with a pully, mixing the cement with sand and gravel, and passing buckets of the cement up an assembly line to workers on the scalfle, who poured the cement mix down the elevator shaft walls. After our work was complete, we headed to the ball field in one of the bateys to play a game of softball.
 
D.R. Mission Team - Friday, June 30
Good Samaritan Hospital, La Romana, Dominican Republic.
The new elevator shaft at the Hospital.
Forming an assembly line to upload our supplies
Forming an assembly line to unload our supplies
Passing the supplies from the bus to the Pharmacy
Teams A, A-1, and B working on the new elevator shaft
Team A using a pully to hoist up buckets of sand to the roof
Team B transporting the sand into piles
Team A-1 shoveling sand and gravel into piles for the mixer
Preparing the mixer for the cement
Mixing the cement, sand and gravel
Mixing the cement, sand and gravel
Pouring the mixture into buckets
Pouring the mixture into buckets
Assessing how many workers needed for the assembly line
Passing the cement buckets up to make the elevator shaft walls
Team A members on the roof of the Hospital
Team A members Robyn, Matt and Sarah
Med Team sorting pills for distribution next week
Med Team members Judy and Donna
Repairing the ambulance
Robyn cooling off just before lunch
Lunch break!
Back to work on mixing the cement
Fetching water to mix with the cement
Pouring the water into buckets to mix with the cement
Doug from Team B transporting the cement to the mixer
Members of Team A and A-1 pouring cement into buckets
Passing the buckets up the assembly line
Assembly line up the elevator shaft
Team B members Josh, Matt, John and Tony
D.R. teammates on the Hospital construction site
Softball time!
Dave helping one of the local kids that was playing
Local kids racing up the fence poles
Ball game fans
Alan gets stuck with a glove a little too small
Swing batter, batter, batter
Watch out for Dora at bat!
Lubin and Tom watching the exciting game
Just a bit outside
In the dugout
STRIKE!
Myles, throwing in a popup hit
Matt rounding first base
Josh hitting a single
Greg on deck
Group picture of the ball players